Had a little time to work on the track this weekend, I put down some additional ballast and playing around with the technique a bit. It's pretty forgiving-- I'm finding some bits I didn't like I can patch up. Little scraps of roadbed can be rolled up a-la playdoh worms and spread where needed. The ballasting is being affixed after arranging with a brush with a shot of dullcote, then a few drops of thinned matte medium after that has dried.
This corner is Etna, BG tower will sit in the corner closest to the camera. I need to add the ex-PRR industrial track to the Tippins Machine Works, which will be a 70-degree (or so) crossing. The crossing will be non-functional.
No comments:
Post a Comment
Please feel free to add comments but the best way to ensure I see them promptly is to email me directly at ccetrains@gmail.com